Playground improvements including paving replacement, storm drain upgrades, landscaping, irrigation, playground striping, basketball hoops with support poles, and preparation for play structure installed by others.
It has been amazing! All the students (even the upper grades) use the play structure constantly. The basketball court is a huge hit and is in constant use. Additionally, the kids use the "football" field every recess, every day even when we open the field. Our space has never been so fully utilized and I get compliments constantly from our families, staff, and even community members (asking about our contractors).

LINCOLN ELEMENTARY SCHOOL PLAYGROUND
10th Ave SSR & ADUs






















Client/Owner:
Location:
Size:
Project Completion Date:
Architect:
The scope of the work is to add three new accessory dwelling units to the ground level per ordinance N0. 162-16. The entire ground floor to be fully sprinklered.
The seismic retrofit scope of work consists of wood structural panel shear walls as the new lateral load resisting system.

10th Ave SSR & ADUs
BURLINGAME INTERMEDIATE SCHOOL AUDITORIUM MODERNIZATION



Client/Owner: Burlingame School District
Location: Burlingame, CA
Size: 8,120 SF
Year Completed: Estimate to be completed in September 2022
Architect: Hamilton + Aitken Architects
Renovation of the main lobby, sound control booth, stage lighting and audio-visual equipment, auditorium lighting, HVAC, interior finishes, roof gutter repair, and roof vent replacement.

BURLINGAME INTERMEDIATE SCHOOL AUDITORIUM MODERNIZATION










Client/Owner: Port of San Francisco /City and County of San Francisco
Location: San Francisco, CA
Size: 12,430 SF
Year Completed: Estimate to be completed in June 2022
Architect: Lisa M. Yergovich/Architectural Resources Group
This project includes a partial building renovation and constructing public restrooms. Scope involves demolition, concrete slab and grade beam work, restroom construction (including plumbing, HVAC, electrical, etc.), roof replacement, exterior siding replacement, doors, and painting. Utility services for the Park are housed in Building 49, and this contract will complete construction of the electrical and mechanical rooms.

CRANE COVE PARK BUILDING 49











Client/Owner: San Francisco Unified School District
Location: San Francisco, CA
Size: 6,500 SF
Year Completed: Estimate to be completed in March 2023
Architect: K2A Architecture + Interiors
Construction of a new classroom building at Hillcrest Elementary School. The new classroom building is approximately 6,500 square feet. The new building will include six (6) general education classrooms, student and staff restrooms and MEP equipment rooms. The scope will also include site work including concrete paving, asphalt paving, bioretention planters, replacement of existing playground matting, fencing and site striping, demolition, and removal of existing hazardous materials.

HILLCREST ELEMENTARY SCHOOL NEW BUILDING













DCIM100MEDIADJI_0084.JPG

DCIM100MEDIADJI_0003.JPG

DCIM100MEDIADJI_0080.JPG

DCIM100MEDIADJI_0046.JPG

DCIM100MEDIADJI_0044.JPG
Client/Owner: City of San Rafael
Location: San Rafael, CA
Size: FS 54: 5,108 SF, FS 55: 4,869 SF
Year Completed: Estimate to be completed in January 2023
Architect: LCA Architects
Partial demolition of two existing fire stations along with additions and alterations to both stations including all associated site work and landscaping.
The core facilities of the station include the following elements:
• Two apparatus bays
• Apparatus support spaces including a medical storage, Clean-up area, turnout storage and related janitor facilities
• Gym
• Station office
• Kitchen, dining, dayroom, and laundry room
• Private sleeping quarters with gender neutral restrooms
• Mechanical, electrical, communications rooms
• Elevator
• Emergency generator
• Fueling station on Fire Station 54

CITY OF SAN RAFAEL FIRE STATION 54 AND 55


















Client/Owner: San Francisco Unified School District
Location: San Francisco, CA
Size: 102,452 SF
Year Completed: Estimate to be completed in January 2023
Architect: HKIT Architects
General School Modernization and reconstruction including ADA Accessibility and Fire/Life-Safety upgrades; sitework; Interim Housing, structural upgrades; aluminum storefronts, windows, curtain wall, and sunshades; new doors and hardware; new finishes including interior and exterior painting, flooring, ceilings, and cabinetry; school kitchen, Cafeteria, and CTE kitchen classroom; new Administration area and main entry, plumbing, HVAC systems and controls, electrical systems including lighting fixtures and controls; low-voltage systems including telephone, data, clock/bell/PA, fire alarm, and security; commissioning of MEP systems.

THURGOOD MARSHALL HIGH SCHOOL MODERNIZATION






WASHINGTON ELEMENTARY SCHOOL WINDOW REPLACEMENT PROJECT
287 LORTON OFFICE BUILDING RENOVATION








Client/Owner: JSR Karp 10 Limited Partnership
Location: Burlingame, CA
Size: 5,850 SF
Year Completed: July 2018
Architect: The Kastrop Group Inc
The 287 Lorton Office Building was a Renovation Project, turning an existing hotel into offices on the second and third floor.
The project included structural upgrades, design build mechanicals, electrical, plumbing, fire sprinkler, and fire alarm systems. We enhanced the project with a 2,500 sq. ft. roof deck, two stair towers and an elevator tower. We also renovated the existing lobby.

287 LORTON OFFICE BUILDING RENOVATION
GEORGE WASHINGTON CARVER WINDOW REPLACEMENT PROJECT










Client/Owner: Burlingame Unified School District
Location: Burlingame, CA
Size: 43,864 SF
Year Completed: August 2019
Architect: Dreiling Terrones Architecture
The George Washington Carver Elementary School was a window replacement project. The existing window blinds and existing window sash were removed, adjustments to existing window frames made, installation of new windows, replacement trims, painting, and other interior finishes.

GEORGE WASHINGTON CARVER WINDOW REPLACEMENT PROJECT
CHARLES DREW COLLEGE PREPARATORY ACADEMY
















Client/Owner: San Francisco Unified School District
Location: San Francisco, CA
Size: 4,800 SF
Year Completed: August 2020
Architect: DSK Architects
Charles Drew College Preparatory Academy is an elementary school dedicated to building a community for their students, an environment where it is comfortable for their students to learn. This project is a General School Modernization and reconstruction project involving ADA Access, Seismic Upgrades, and Fire/Life-Safety upgrades.
The project includes hazardous material abatement, demolition of interior finishes, mechanical, plumbing and setting up of the electrical systems. It also encompasses installation of the fire sprinkler system, fire alarm, and restroom upgrades.
We added new flooring and ceilings throughout the school. We also completed work on the wall finishes, doors and hardware, windows, roofing, mechanical units, lighting, security, exterior painting, the clock and speaker system, the security and front gate arrangement, and trash enclosures.
There is also an interim housing scope for this project along with the preparation of an upper play yard to receive new Interim Housing units. Modifications at the Interim Housing units also include: Restroom accessories, classroom cubbies, signage, connections for plumbing, and installation of electrical and fire alarm systems.

CHARLES DREW COLLEGE PREPARATORY ACADEMY
SFO MATERIALS TESTING LAB








Client/Owner: City and County of San Francisco, San Francisco Airport Planning, Design and Construction
Location: San Mateo, CA
Size: 2700 SF
Project Expected Completion Date: February 2021
Architect: San Francisco Airport Planning, Design and Construction
The SFO Material Testing Lab is a one story CMU building with a steel truss roof structure on an 18" mat slab anchored with helical piles. The project includes a custom curtain wall, storefront and window systems that are oriented and tied into the BMS System for optimal energy efficiency. The project includes laboratory space, break rooms, custodial closets and restrooms.

SFO MATERIAL TESTING LAB
CLAIRE LILENTHAL ELEMENTARY SCHOOL






Client/Owner: San Francisco Unified School District
Location: San Francisco, CA
Size: 33,752 SF
Project Expected Completion Date: September 2021
Architect: Marshall Lee Inc.
Claire Lilienthal Elementary School is a modernization and reconstruction project consisting of the Main Building (Building A).
The project includes ADA Access and Fire/Life/Safety upgrades, voluntary seismic strengthening,
partial roof replacement, and terra cotta repair. The play structure and yard were also rehabilitated.
Interior modernization consists of new flooring, ceilings, and light fixtures, Clock/Bell/PA, Security and video surveillance telephone systems throughout the school, restrooms and warming kitchen, interior painting, hazardous material remediation, and other miscellaneous site work such as interior renovation work, fencing and gates, and interim housing removal.

CLAIRE LILENTHAL ELEMENTARY SCHOOL
SHERIDAN ELEMENTARY SCHOOL MODERNIZATION AND INTERIM HOUSING










Client/Owner: San Francisco Unified School District
Location: San Francisco, CA
Size: 46,255 SF
Project Expected Completion Date: August 2021
Architect: Lemanski and Rockwell Architects
Sheridan Elementary School is a modernization of a pre-kindergarten to 5th-grade elementary school in San Francisco. The 2-story school building includes hazardous materials abatement, ADA Access, and Fire/Life/Safety upgrades, voluntary seismic upgrades at the South Wing as well as Pre-K and Kindergarten play yards and play structures.
The Interior modernization of the school consists of Lobby windows and a new roof, renovation of Pre-K, TK, and kindergarten restrooms. We added food service, kitchen, classroom, and administration upgrades to the school’s serviceability.
At the Multi-Purpose Building and South Wing Corridors, we added casework and flooring, suspended ceiling systems, electrical systems including light fixtures, controls, fire alarm system, a clock/bell/PA system, video surveillance, an Air Phone arrangement, an elevator access system solution, MDF and HVAC combo, boiler pumps and controls, and complete commissioning of the MEP systems.

SHERIDAN ELEMENTARY SCHOOL MODERNIZATION AND INTERIM HOUSING
CIVIC CENTER STATION SCISSOR STAIRS PROJECT








Client/Owner: San Bay Area Rapid Transit District
Location: San Francisco, CA
Project Expected Completion Date: July 2021
Architect: Robert McKie
This BART Station Project is known as the Scissor Stairs Project at the Civic Center BART Station in San Francisco. It consists of the installation of new stairways extending from the BART platform to the Concourse levels with an intermediate landing at the San Francisco Municipal Railway ("MUNI") platform level. All of the reconstruction was done while the station was in service.

CIVIC CENTER STATION SCISSOR STAIRS PROJECT
NIHONMACHI LITTLE FRIENDS






Client/Owner: Nihonmachi Little Friends
Location: San Francisco, CA
Size: 9,230 SF
Project Completion Date: May 2017
Architect: HKIT Architect
Nihonmachi Little Friends School located in San Francisco’s Japantown was a horizontal building addition to a historic building designed by world-renowned architect Julia Morgan. The 3 stories included a 1st floor lobby, restroom and fitness room, the 2nd level included the main preschool learning area and staff offices, and finally the 3rd level included a rooftop playground with stair and elevator access.
The project consisted of demolishing an existing playground, underpinning the existing historic building, placing a new concrete foundation, steel structure, elevator tower and stair tower. WD&C installed completely new mechanical, plumbing, electrical, fire sprinkler, storefront, and elevator systems. The project featured an interior stair tower with terrazzo stairs and imprinted resin guardrail.

NIHONMACHI LITTLE FRIENDS
1050 SANSOME






Client/Owner: 1050 Sansome
Location: San Francisco, CA
Size: 37,027 SF
Project Completion Date: January 2016
Architect: Murphy Burr Curry Inc Structural Engineers
The 1050 Sansome Street project was a structural strengthening of a six story building consisting of concrete and steel. We converted the first two floors at the entrance into a grand lobby with an ADA ramp establishing a vision of a grandness.

1050 SANSOME
FIRE STATION #24






Client/Owner: Zolman Construction & Development / City of San Mateo
Location: San Mateo, CA
Size: 5,750 SF
Project Completion Date: February 2014
Architect: Shah Kawasaki Architects
Fire Station #24 comprised of rough framing, sheeting, hold downs, shear walls, and siding to add to the polished look of the Firehouse

FIRE STATION #24
BURLINGAME HIGH SCHOOL NEW CLASSROOM BUILDING






Client/Owner: San Mateo Union High School District
Location: Burlingame, CA
Size: 16,000 SF
Project Completion Date: December 2015
Architect: Art-ik Art & Architecture
Rough framing of a two story and attic new classroom building.

BURLINGAME HIGH SCHOOL NEW CLASSROOM BUILDING
ROCKRIDGE LIBRARY









Client/Owner: City of Oakland
Location: Oakland, CA
Project Completion Date: June 2015
Architect: City of Oakland
The Rockridge Library was in need of painting. The entire building’s exterior elevations surface was enhanced with a new look creating a welcome feeling to the library .

ROCKRIDGE LIBRARY
THOMAS EDISON CHARTER ACADEMY







Client/Owner: City of Oakland
Location: San Francisco, CA
Size: 19,020 SF
Project Completion Date: January 2016
Architect: Gelfand Partners Architects
The Thomas Edison Charter Academy is a Portable Design/ Build Classroom building project. The portable classroom building included the delivery and positioning of the structure. We completed the electrical power systems - data/voice, fire alarm, security, and the clock bell speaker.

THOMAS EDISON CHARTER ACADEMY
WILLIE BROWN JR MIDDLE SCHOOL SIDEWALK AND FENCE



Client/Owner: SAN FRANCISCO UNIFIED SCHOOL DISTRICT
Location: San Francisco, CA
Project Completion Date: August 2016
Architect: SANDIS CIVIL ENGINEERS SURVEYORS PLANNERS
To increase the safety and security of Willie Brown Jr Middle School’s property we replaced the hazardous sidewalks, installed a new fence around the perimeter, added glazing and improved the lighting systems making it easier for the students to work and learn. Lastly, we replaced the gymnasium floor that had been damaged by water intrusion

WILLIE BROWN
610 - 600 CLIPPER





Client/Owner: 610-660 Clipper 1 LLC
Location: San Francisco, CA
Project Completion Date: January 2017
Architect: FTF Engineering Inc
The Soft Story upgrades to 610-600 Clipper Street were for both 3 story buildings. We needed to increase the rigidity of the first floor, which is a wood-frame construction by making it less susceptible to earthquakes in the Bay Area. The openings in this building were garage spaces for the tenets that required retrofitting.

610-600 CLIPPER
400 DUBOCE



Client/Owner: 400 Duboce, LLC
Location: San Francisco, CA
Project Completion Date: June 2017
Architect: KPFF ENGINEERING
400 Duboce Street project was a soft-story seismic retrofit project. The seismic strengthening of a 60+ unit building needed the addition of concrete footings, blocking and clipping, and the addition of shear walls to assure the strengthening of the building's structure.

400 DUBOCE
2075/2099 Market SSR & CAP-EX





Location: San Francisco, CA
Project Completion Date: February 2017
2099 Market Street is a soft story retrofit project. We strengthened and underpinned the existing footings of the building to strengthen the building in case of an earthquake. We also completed new siding, window replacement, and painting as part of a capital expansion project.

2075/2099 Market SSR & CAP-EX
TENANT IMPROVEMENT & STRUCTURAL RETROFIT - 810 CLAY







Client/Owner: Engineers and Scientist of California Local 20
Location: San Francisco, CA
Size: 17,112 SF
Project Completion Date: May 2014
Architect: Todd Jersey Architects
810 Clay Street is a Structural Retrofit and Tenant Improvement Project. This encompassed installing piers, adding grade beams, collector beams, and shotcrete shear walls. The Tenant Improvement portion includes abatement/demo, framing, MEP, low voltage, fire alarm, framing, insulation, sheetrock, and painting.

TENANT IMPROVEMENT & STRUCTURAL RETROFIT - 810 CLAY
LOCKWOOD and WEBSTER RESTROOM RENOVATION






Client/Owner: Oakland Unified School District
Location: Oakland, CA
Project Completion Date: August 2016
Architect: Dougherty & Dougherty Architect
Lockwood Elementary School was a Renovation of 3 boys’ restrooms, and 3 girl’s restrooms. It included toilet partitions, terrazzo flooring, plumbing, and toilet accessories.
Webster Elementary School’s Renovation Incorporated 1 girl’s and 1 boys’ restroom. The Terrazzo flooring and Patterned tile walls enhanced the ambience of each restroom. New doors and hardware were added, pulling the design together.

LOCKWOOD & WEBSTER RESTROOM RENOVATION
3266 MISSION






Client/Owner: Owner 3264 - 3274 Mission Street, LLC
Location: San Francisco, CA
Size: 2,000 SF
Project Completion Date: December 2016
Architect: Louis H. Felthouse Architects Inc
The 3266 Mission project modernizing the storefront, create a storage solution in order to mitigate a NOV and complete a soft story retrofit

3266 MISSION
SANKOFA P2



Client/Owner: Oakland Unified School District
Location: Oakland, CA
Project Completion Date: August 2014
Architect: Susana Meek Architecture
The Sankofa P2 project was a school job that comprised of saw-cut asphalt, trench for underground utilities, backfill, and patch asphalt. We coordinated an installation of portables, fire extinguishers, signage, hook up water and waste to portables, install fire alarm, data, voice, security, clocks, bell and speaker, and then painted.

SANKOFA P2
VELOS MOBILE and STUDIO VARA ARCHITECTS OFFICE T.I.





Client/Owner: Velos Mobile
Location: San Francisco, CA
Size: 2,000 SF
Project Completion Date: March 2017
Architect: STUDIO VARA
The Velos Mobile & Studio Vara Architects Office was a Tenant Improvement project. The plan was to augment the space creating a professional look and feel by adding sheetrock, painting, adding doors and hardware, modernizing the electrical and low voltage, plumbing, new architectural countertops and more efficient lightening.

VELOS MOBILE & STUDIO VARA ARCHITECTS OFFICE T.I.
792 HAIGHT SOFT STORY RETROFIT




Client/Owner: CARETH REID
Location: San Francisco, CA
Project Completion Date: SEPTEMBER 2016
Architect: FTF ENGINEERING INC
792 Haight Street is a soft story retrofit project. We added concrete, structural steel, and rough carpentry. To finish off the process of the retrofit and minimize the visual impact, we refinished the flooring, painted the building and added a coating to the steel.